ACME ENGINEERING PRODUCTS offers hot water boilers based on proven design for building complexes, commercial structures, and light industry. This boiler can be connected directly on the high voltage power distribution network.

​

Any voltage up to 20 KV, 3 phases, 3 wires, and centerline grounded line.

  • Capacity range: 2500 to 68,000 KW

  • Electric Power Supply Voltage: 4160 to 25000 V

  • Maximum Operating Temperature for Standard Models: 180 °C (360 ° F)

  • Operating pressure: 3 to 14.5 bar (50 to 200 psi)

  • Power Feeds (Current Passage) assembled and certified for 42000 V and 16 bar (230 psi) for any operating voltage

  • Fast Response: 0 to 100 % capacity in:
    Hot State: 1 minute
    Cold to Hot state: 15 to 25 minutes (depends on the size)

  • Economical even for capacities between 2 to 6 MW

  • Simple controls

  • Can be added to existing systems and is suitable for optional water storage facilities

  • Ability to take advantage of low off-peak electricity rates and demand swings

These Electrode Boilers have unlimited application possibilities wherever a need for process or space heating exists. A partial list of possible uses includes:

​

  • Office and apartment building

  • Hospitals, schools, hotels

  • Food processing plants

  • Clothing and textiles plants

  • Industrial plants

  • Plastic and chemical plants

  • Mining operations

  • Power plants for District Heating

  • Car Manufacturing

CEJW boilers convert virtually 100% of the electrical energy into heat. Automatic load and temperature controls provide step-less control over an output range from 10 to 100%.

​

  • Economical installation

  • Lower operating costs

  • Safer operation

  • Minimal maintenance

  • Environmentally friendly

​

All our Immersed Electrode Boilers are guaranteed for one year in operation or 18 months after shipment against defective workmanship and material. Guarantee limited to replacement of defective parts only, when returned, prepaid, to the factory. Copy of guarantee available on request.

  • Pressure vessel, ASME (Section I or IV) design, CRN/U stamp pressure vessel registration certificate or CE / PED required

  • Complete assembled Power feeds tested and certified for 16 bar (230 psi) and 42 KV

  • Boiler actuator and capacity control system

  • Large DN 500 (20”) Manhole

  • Sheet metal jacket and 100 mm (4”) ceramic fiber thermal insulation

  • Safety cage surrounding high voltage connections

  • Safety valve(s)

  • Manual drain (initial fill-up) valve

  • Automatic air vent